# 10m Waterproof High-Vis Orange Dog Training Tracking Long Lead

GH₵ 250 · Dome

High-visibility neon orange heavy-duty waterproof dog training and tracking long line leash. Constructed from durable PVC-coated webbing that resists water, mud, odor, and tangled knots while providing long-distance freedom during recall training.
Key Features:
Item Type: Dog Recall & Tracking Long Line Lead
Material: Waterproof PVC / TPU coated heavy-duty dirt-proof webbing
Hardware: Solid zinc-alloy heavy-duty 360° swivel snap hook
Length: Extra-long tracking line (10 meters / 33 feet+)
Key Benefits: Easy to wipe clean, non-absorbent, rot-resistant, and high visibility in grass/bush
Ideal For: K9 field training, recall obedience, hunting dogs, and open-field walking

## Details

- Type: Accessories

Category: Pets / Pet Accessories

Seller: [2 REAL ENTERPRISES](https://trueseller.app/sellers/2-real-enterprises-9fb81658e97e3cb95be09502)

[Listing](https://trueseller.app/marketplace/pets/pet-accessories/10m-waterproof-high-vis-orange-dog-training-tracking-long-lead-9fcd88dcf3cde73d39dfd16d)
